011W (05/05)  -  407 (IIb)  HEIST

ZT2 - Zeebrugge
X = 70100
Y = 227925
Benaderende coordinaten

SUMMARY REPORT WELL ZT2 & ZT3
	LNG TERMINAL - ZEEBRUGE

                 =============================

I. OBJECTIVE 
-------------
To investigate the Yc clay formation as an extension program of well ZT1 (11W0280) for the 
possibilty of a gas storage site in LNG-Terminal Zeebrugge by obtaining NON 
DESTRUCTIVE samples (Well ZT2) and PRESSIOMETER TEST IN-SITU (Well ZT3).

II. CONTRACTOR
--------------
The drilling job and -
coring for Non-Destructive Samples : SMET BORING NV. (B).

The Pressiometer Test in-situ      : PMIT (U.K.).

Logging                            : DIASOL (L).
A. ZT2 : 
   Operation period              : 9/05/1989 - 8/08/1989
   TD date                       : 19/07/1989
   Total day-operation           : 92 days
   Effective day-operation       : 54 days
   Well diam. and architecture   : See Fig.
   Drilling method               : Hammer/water injection/
                                   chisel mounted on csg shoe
   Mud                           : -Dry/bentonite in the
                                    destructive section
                                   -Dry in the sampling
                                    section
   ND-Sampling method            : Hydraulic piston
   Total non-destructive samples : 39 samples
   Top sampling depth            : 125.00 m BGL
   TD                            : 190.40 m BGL
   Completion                    : PVC pipes with intermediate
                                   filter (see Fig.), annulus
                                   was filled with fine sand,
                                   filter section with
                                   calibrated sand grain,
                                   sealed with clay-stop at
                                   the filter top
   Logging                       : Through PVC
                                   - Gamma ray
                                   - Darcy Log
IV. LOG INTERPRETATION
----------------------
Only well ZT2 was logged (by DIASOL).

The interpretation was based on the gamma ray log, correlated with well ZT1. Correlation 
profile is shown on Fig.
ZT2 is located at south-east of ZT1. The distance between 
ZT1 - ZT2 is about...m.

Comments :
   - In general, both of the wells are very good correlated.
   - ZT1 was logged through the casing  by TNO and ZT2 was 
     logged through the PVC pipe by Diasol.
   - Initial sea bed (ZT2) is placed at 12m
   - Average depth difference between ZT2 & ZT3 = 2 - 2.5 m,
     however the different become larger towards the bottom
     hole.
   - The depth difference is may be due to :
      > Different in reference level. (ZT1 was logged before
        the terminal was completed).
      > Different in cable stretch. 
      > Natural dip of the formations.
   - Difference in bed thikness can be due to the different
     in logging speed. However, local irregularities can also
     occur.
   - The gamma counts (cps) of both logs are not reliable as
     correction value due to the casing or PVC influence are
     not available.
   - Peak to peak correlation are good and easy to identify.
   - The top of Yc(ZT2) according the log was placed at 126 m,
     but during drilling this was observed at about 124.5m.
   
V. DICUSSIONS AND CONCLUSIONS
-----------------------------
1. The project has been successfully carried out. 
   The operation time was long due to the low ND sampling rate    (only 1 or max. 2 samples 
per day), but the quality of Non-     Destructive samples are good. However, sampling rate
   can be improved by adjusting the tripping technique.

2. The data acquisition of SBP-Pressiometer in-situ were
   having more problems because the tool has never been used
   to test in depth well. Problems were mainly leakage
   and incompetant of the data collection unit. When depth is
   increased, the automatic data collection system has to be
   changed with manual recording by using hand-oil pump to
   blow out the membrane instead of using nitrogen and the
   data were recorded manualy because the electronic


  converter unit did not function properly.

3. 39 Non-Destructive samples and 35 SBP-tests performances were obtained.

4. The correlation between ZT1 and ZT2 is good. The depth
   difference has to be reverified.

TABLE 1.                   ZT2 - LNG TERMINAL ZEEBRUGGE 

                  NON-DESTRUCTIVE SAMPLES LISTING
                  ===============================


 Date     Sample no. Depth (BGL) (M)     Recuperation (CM)  Weight (KG) 
-------   ---------- ----------------    -----------------  -----------

30/5/89       1       125.00 - 125.40            40               -    
 2/6/89       2       127.00 - 127.37            37             12.75 
 5/6/89       3       129.00 - 129.43            43             12.85 
 5/6/89       4       131.00 - 131.38            38             12.55 
 6/6/89       5       133.00 - 133.43            43             13.05 
 6/6/89       6       135.19 - 135.62            43             13.00 
 7/6/89       7       137.00 - 137.43            43             13.17 
 8/6/89       8       139.21 - 139.60 hard       39             12.60 
 8/6/89       9       140.84 - 141.23            39             12.65 
 9/6/89      10       143.06 - 143.49            43             12.80
12/6/89      11       145.03 - 145.42            39               -
14/6/89      12       147.06 - 147.45            39             13.20
14/6/89      13       148.87 - 149.30            43             13.15
15/6/89      14       151.24 - 151.65            41             13.30
16/6/89      15       152.92 - 153.31            39             13.00
19/6/89      16       154.98 - 155.23            25             12.60
20/6/89      17       156.86 - 157.23            37               -
21/6/89      18       157.98 - 158.39            41               -
21/6/89      19       159.73 - 160.15            42               -
 3/7/89      20       161.41 - 161.84            43             13.00
 4/7/89      21       162.61 - 163.04            43             13.20
 5/7/89      22       164.11 - 164.53            42             13.10
 6/7/89      23       165.53 - 165.96            43             13.50
 6/7/89      24       166.97 - 167.40            43             13.10
 7/7/89      25       168.62 - 169.05            43             13.40
10/7/89      26       170.01 - 170.44            43             13.40
10/7/89      27       171.44 - 171.86            42             13.50
12/7/89      28       172.94 - 173.37            43             13.40
12/7/89      29       174.36 - 174.79            43             13.25
13/7/89      30       176.08 - 176.51            43             13.45
13/7/89      31       177.56 - 177.99            43             13.40
13/7/89      32       179.00 - 179.40 hard       40             13.25 
14/7/89      33       180.64 - 181.05            41             13.35
14/7/89      34       182.22 - 182.65            43             13.30 
14/7/89 *    35       183.38 - 183.80            42             13.45
15/7/89      36       185.54 - 185.97            43             13.40
18/7/89      37       187.52 - 187.95            43             13.30
18/7/89      38       188.95 - 189.38            43             13.35
19/7/89      39       189.97 - 190.40            43             13.35
     
        * night shift

TABLE 3.


F O M A T I O N                DEPTH ZT1   DEPTH ZT2   DELTA-D
BASE             TOP              (M)         (M)        (M)
----             ---           ---------   ---------   -------

QUAT.         ASSE CLAY           35.5       37.5         2

ASSE CLAY     WEMMEL SAND         46         47.5         1.5

WEMMEL SAND   PANISEL P2III       49         50.5         1.5
              (OEDELEM MEMBER)
P2III         P2II                57         58           1 

P2II          P2I                 69         71           2

P2I           P1D                 75         77.2         2.2
              (VLIERZELE MEMBER)
P1D           P1CII               86.5       88.5         2
              (PITTEM MEMBER)
P1CII         P1CI                95         97.5         2.5

P1CI          P1M                100        103           3
              (MERELBEKE MEMBER)
PIM           YD                 109.5      113           3.5
              (EGEM MEMBER)
YD            YC                 121.5      126           4.5
              (IEPER MEMBER)